Demolition & Enabling Contracts
A&J SERVICES Started as a demolition company, clearing waste and enabling works came as part of the demolition works. This was the starting point for us, times were very different, considering methods and waste disposal. At this time a soft strip of an office building/floor, would be a complete rip out. This would be back to the original structure, including:
- ANY WALLS, PARTITION OR OTHER
- SUSPENDED CEILINGS
- FLOOR COVERINGS
- RAISED FLOORS
- TILES
- SCREEDS
- DATA AND ELECTRICAL CABLING
- AIR CONDITIONING
- DUCTING OF ANY SORT
- PLASTER HACKED BACK TO BRICK
- FURNITURE AND FITTINGS (removed)
Basically everything would go, right up to bare structure. This could be down to a number of avenues. More often than not, a rented office floor, would have to be returned to its original state, as part of contract. The normal state would be completely open planned, carpeted and with suspended ceilings. After this, the new occupier would fit out to suit.
Of course this has now changed. In todays climate and with respect to the environment, only necessary demolition works take place, allowing minimisation on waste and processes. These are changes that we accommadated, with further licencing and adaption to demolition phases. Adhering to all Health and Safety measures.